A low construction quote feels like a win. But in most cases, it is the beginning of a series of costly surprises. Understanding how and why low quotes are structured helps you make a more informed decision.
How Low Quotes Are Typically Structured
- โธMissing items: waterproofing, compound wall, external work left out
- โธUnderspecified materials: "M15 concrete" instead of M25
- โธLow labour rates that change during construction
- โธNo warranty provisions
- โธOpen-ended clauses: "Materials as per availability"
Discuss Your Project
Tell us about your project and we'll be in touch.
The Escalation Pattern
Most low-quote projects follow this pattern: mobilization advance paid โ contractor starts work โ "surprise" scope additions appear โ homeowner is committed financially and emotionally โ final cost is 30โ50% above original quote.
Hidden Costs That Are Commonly Omitted
- โธSBC (Soil Bearing Capacity) testing
- โธAnti-termite treatment
- โธExternal drainage and RCC drain channels
- โธStaircase and parapet walls
- โธOverhead water tank (RCC or Sintex)
- โธSump construction
- โธElectrical main panels and earthing
- โธPlumbing overhead tank connection
How to Protect Yourself
Always insist on an itemized BOQ with specifications before signing. Have an independent engineer review the BOQ. Link all payments to milestone completion. Use a signed change order process for any scope additions.
FAQs
Is it ever safe to go with the lowest quote?
Yes, if the lowest quote is fully itemized, with all specifications, realistic quantities, and comparable scope to higher quotes. The problem is rarely price โ it is scope completeness.
Explore Buildogram Marketplace
Need expert guidance?
Talk to our structural engineers for project-specific advice.