Saved ₹4.2L on a G+1 House in Velachery
Contractor quote had 18 missing or inflated line items totalling ₹4.2 lakhs above market rate.
Itemized BOQ review exposed all discrepancies. Client negotiated down and signed at correct rate.
Engineering decisions documented with technical accuracy — problems identified, interventions made, outcomes recorded.
Contractor quote had 18 missing or inflated line items totalling ₹4.2 lakhs above market rate.
Itemized BOQ review exposed all discrepancies. Client negotiated down and signed at correct rate.
15-year-old villa had deep horizontal cracks in external ground-floor columns. Owner feared demolition.
UPV testing revealed 40% concrete strength loss in 2 columns. Jacketing performed instead of rebuild.
Client based in Singapore needed complete site monitoring without being present in Chennai.
14-month build with daily portal updates, 0 cost overruns, and structural warranty handover.
Supplier attempting to deliver cement batches manufactured 95 days earlier (limit is 90 days per IS 455).
Batch date verification by our site engineer caught all 48 bags. Fresh stock delivered with new MTC.
If Buildogram helped you identify savings, prevent a structural issue, or manage a build successfully — we would like to document it.