Turnkey Construction

Complete Turnkey Construction in Chennai — Design to Handover

One team, one contract, one price — from soil test and architectural design to supervised construction and formal handover with a 10-year structural warranty. No hidden costs, no contractor excuses.

Get Turnkey QuoteHow It Works
Everything Included

What's Inside a Buildogram Turnkey Package

🔬
Soil Bearing Capacity (SBC) Test
Determines foundation type before design
📐
Architectural Design (2D + 3D)
CMDA/DTCP compliant floor plans and elevations
🏗️
Structural Engineering Design
IS-code compliant beams, columns, slabs
📋
Capped BOQ Contract
Every material itemized, locked at signing
🧱
Material Sourcing
Wholesale-rate cement, steel, sand and bricks
👷
Construction Execution
Managed by our partner contractor network
🔍
500+ Quality Checks
Concrete tests, rebar inspections, milestone sign-offs
🔑
Handover Documentation
Structural warranty, lab receipts, as-built drawings
Pricing Packages

Indicative Package Rates

Rates are indicative and vary by location, plot size, and design complexity. Final pricing is fixed in a signed BOQ.

Basic

₹1,650 / sqft
  • M20 grade concrete
  • Standard TMT steel
  • Flush door frames
  • Basic flooring tiles
  • Standard sanitary fixtures
  • Asian Paints Tractor Emulsion
Get Basic Quote
MOST POPULAR

Standard

₹1,950 / sqft
  • M25 grade concrete
  • Fe500D TMT (CRS for coastal)
  • Teak-finish door frames
  • Kajaria/Somany tiles
  • Jaguar / Hindware fixtures
  • Asian Paints Royale
Get Standard Quote

Premium

₹2,400 / sqft
  • M30 grade concrete
  • Corrosion-resistant steel, full CRS
  • Teak hardwood doors
  • Italian/Vitrified large tiles
  • Grohe / American Standard
  • Asian Paints Apex + Texture
Get Premium Quote

Turnkey vs Traditional Contractor

AspectBuildogram TurnkeyTraditional Contractor
Single Point of Contact✅ Yes — one team❌ No — multiple vendors
Design Included✅ Architecture + Structure❌ Usually separate cost
Material Sourcing✅ Wholesale rates, MTC-verified⚠️ Contractor-chosen, markup hidden
Quality Supervision✅ Independent engineer checks❌ Contractor checks own work
BOQ Transparency✅ Every line item specified❌ Lump sum per sqft
Cost Overrun Risk✅ Capped, contractor bears overrun❌ Owner bears all overruns
Structural Warranty✅ 10-year legal warranty⚠️ Verbal 1–2 year promise

Turnkey Construction FAQs

What exactly is included in a turnkey package?

Our turnkey package includes everything from soil SBC testing and architectural design to construction execution, material sourcing, site supervision, quality testing, and formal handover — including structural warranty documents and all lab test certificates.

Are the per-sqft rates inclusive of all materials?

The per-sqft rates cover the structural work, brickwork, plastering, waterproofing, basic flooring, electrical wiring (excluding fixtures), and plumbing roughing. Premium items like designer tiles, modular kitchens, wardrobes, and false ceilings are additional and quoted separately.

What is the difference between turnkey and a contractor-managed build?

In a contractor build, you hire the contractor, source materials yourself (or trust the contractor to source them), and have no independent verification of work quality. In our turnkey model, we manage everything under a transparent, capped contract with independent engineering oversight throughout.

Can I customise materials in a turnkey package?

Yes. The packages are a starting baseline. You can upgrade specific elements (e.g., use premium tiles but standard fittings) or downgrade others. All customisations are reflected in the final BOQ before contract signing.

How long does a turnkey G+1 construction take?

A standard G+1 turnkey project (2,000 sqft) takes 14–18 months from soil test to handover — including design (2 months), approval (1–2 months), and construction (10–12 months).

Do you manage CMDA approval in a turnkey package?

Yes. Our empanelled architects handle the full CMDA/DTCP drawing submission and approval process. The approval timeline depends on the authority's processing speed — typically 3–6 months.

What if the project costs more than the BOQ?

If scope overruns happen due to contractor errors or material waste, those costs are borne by the contractor — not by you. The BOQ you sign is a capped contract. If you request design changes mid-construction, we issue a formal amendment BOQ before any additional work begins.

Ready for a Stress-Free Build?

Talk to our team to understand which package fits your project and get a preliminary cost estimate within 24 hours.