Phase 1: Design & Approval (Transparency Groundwork)

Locking specifications, calculating soil bearing capacities, and designing for structural safety.

01

Plot Audit & Soil Testing

We mandate a Soil Bearing Capacity (SBC) test on your plot before designing. This determines whether you need a conventional footing, raft footing, or deep piles, preventing slab cracking years down the line.

02

Architectural & 3D Drafting

Our design team maps your vision to CMDA/DTCP norms, providing customized 2D layout plans and photorealistic 3D elevations. We configure layouts for natural ventilation, coastal sun heat deflection, and Vaastu.

03

Granular BOQ Sizing

We generate an itemized Bill of Quantities (BOQ) with clear unit quantities and exact material brands (e.g. Tata Steel vs local steel, UltraTech cement vs generic). This is signed into a legally capped fixed-price contract.

🔬 Quality Audits in This Phase:

  • Mandatory Soil SBC lab testing reports
  • 100% CMDA & DTCP code-compliance checks
  • Locked material specs sheet signed per page

All concrete mixing slump parameters, steel tension alignments, and lab receipts are stored inside your interactive client portal.

Preview Client Dashboard Demo
Capped Spending

Milestone-Linked Escrow Payments

No lump-sum advances. Your construction funds stay safe and are released strictly based on structural milestones. Overruns are paid by us.

10%

1. Booking & Signoff

Sign BOQ-true capped contract. Soil testing, architectural and structural designs commence.

Verified Stage
15%

2. Foundation & Plinth Complete

Excavation completed, SBC footing cast, and plinth raised to anti-flood height. Approved by structural engineer.

Verified Stage
40%

3. Brickwork & Concrete Slabs

Divided into floor-wise casting milestones (G slab, G+1 slab). Paid ONLY after rebar tie checks are signed.

Verified Stage
20%

4. Plastering, MEP & Concealed Lines

Wall plastering, concealed electrical wiring channels, and leak-proof CPVC lines completed.

Verified Stage
10%

5. Finishing, Tiling & Painting

Kajaria tiling, internal Asian Paints coating, sanitary fixtures install, and leak testing completed.

Verified Stage
5%

6. Keys Handover & Clearance

Final walkthrough, ponding tests approved, and structural warranty activated.

Verified Stage