BuildBOQ Audit
⚠️MOST CONTRACTOR QUOTES HIDE ₹5–20 LAKHS IN EXTRAS

Get Your Contractor
Quote Audited.

Before you sign anything — let Buildogram engineers check every line item, rate and spec in your contractor's quote. We expose what's inflated, what's missing, and what's non-negotiable.

Get Free BOQ AuditCalculate True Cost
₹5–20L
Avg hidden charges found
8+
Audit categories
48hrs
Report turnaround
Free
Initial audit consult
The Real Problem

Where contractors hide your money

These are the most common "extras" that appear after you sign a per-sq.ft contract.

Hidden Cost ItemTypical Impact
× Excavation depth variance₹1–4 lakhs
× Foundation upgrade (clay soil)₹2–5 lakhs
× Steel grade substitution₹1–3 lakhs
× Compound wall (omitted)₹3–8 lakhs
× Septic tank + STP (omitted)₹1–3 lakhs
× Electrical points undercount₹50K–2 lakhs
× Painting primer layers₹30K–1 lakh
× Rate inflation across items5–20% of total

* Based on Buildogram's analysis of 100+ contractor quotes in Chennai & Tamil Nadu

What We Check

8 critical areas we audit in your quote

⚙️

Steel Quantity & Grade

Verify the exact tonnage, dia and grade of steel matches your structural drawing. Most contractors under-specify by 15–25%.

🏭

Cement Bags & Grade

Confirm the correct OPC/PPC grade and bag count per cubic metre of concrete. Grade substitution is the oldest trick.

🪨

Excavation & Foundation

Check if foundation depth, footing size, and PCC thickness match the soil report. Underpriced excavation blows up later.

🚿

Plumbing Spec

CPVC vs PVC vs GI — brands, wall thickness, and fitting counts that dramatically affect durability and cost.

🔌

Electrical & Wiring

Wire gauge, number of points, switch brand, DB box specification — cheap contractors cut all of these silently.

🎨

Plastering & Painting

M-sand vs river sand, plaster thickness, number of coats, and primer layers — each one affects finish quality.

💰

Rate Inflation Check

We cross-check every line item rate against current market rates for Chennai. Overpricing of 10–30% is common.

🚫

Missing Scope Items

Compound wall, septic tank, rainwater harvesting, grills — contractors leave these out then demand extras mid-project.

How It Works

4-step BOQ Audit process

01

Share Your Quote

Submit the contractor BOQ or quote (even a verbal estimate). Share drawings if available.

02

Engineer Review

Our structural engineers analyse every line item against Chennai market rates and standard specs.

03

Audit Report

You receive a detailed report: what's fair, what's inflated, what's missing, and what to negotiate.

04

Negotiation Support

Optional: We help you negotiate with the contractor or prepare a proper counter-BOQ.

🏗️If we find <₹1L in savings — audit is free
📊Detailed line-by-line audit report
🤝Optional negotiation support included
48-hour turnaround on first review

Request Your Free BOQ Audit

Share your contractor quote (even a verbal one). Our engineers will review it and identify every discrepancy before you sign.

Or call us directly: +91 90000 00000

Disclaimer: This BOQ review is advisory and based on provided documents. It is not engineering, legal, contractual, or construction certification.