Hidden construction costs are the single biggest source of homeowner distress in India. Projects regularly end up 30โ60% over the original quote, not because of genuine price changes, but because of deliberate scope omissions and poor contracts.
Most Common Hidden Costs
- โธSBC lab testing
- โธAnti-termite treatment
- โธSump and overhead tank construction
- โธCompound wall and gate
- โธStaircase handrail and finish
- โธExternal drainage and rainwater channels
- โธElectrical main panel, earthing
- โธTemporary shed and site setup costs
- โธWater supply for construction
- โธTransportation and crane charges
- โธChange orders for "design modifications"
Discuss Your Project
Tell us about your project and we'll be in touch.
The Simple Rule to Avoid Hidden Costs
Insist on an itemized BOQ that covers all categories above. If any item is not in the BOQ โ it is not in the price. Before signing, use a checklist to verify the BOQ is complete.
Red Clause Alert: Watch for These Contract Phrases
- โธ"Any additional work as directed by client" โ unlimited scope expansion
- โธ"Materials as per site availability" โ contractor decides quality
- โธ"Payment on demand" โ not milestone-tied
- โธ"Subject to material price revision" โ rate escalation clause
- โธ"GST and taxes extra" โ check how this is calculated
FAQs
Should I pay a percentage advance to a contractor?
Avoid large advances. A mobilization advance of 5โ10% of contract value is standard. Tie all subsequent payments to specific, verifiable construction milestones โ not to time elapsed or contractor demand.